Robyn Boyd

SR 520 Construction Project Engineer, Washington State Department of Transportation

Robyn Boyd has over 32 years of design and construction experience with WSDOT. The last 14 years Robyn has been a Project Engineer on several Design Build projects including SR 520 floating bridge, the longest floating bridge in the world. Robyn currently serves as the construction Project Engineer on an $455 million dollar Design-Build Project on SR 520 which will construct a 710 foot lidded structure and a new 6100 foot fixed in-water highway structure.


Appearances